PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished compacting around Monumental stair radius Facing West (800x600).jpg Installing shear wall panels at Elev. 7-Stair -4,5 (2nd Floor) Facing South-East (800x600).jpg Installing steel deck angles at Elev. 1,2,3 (2nd Floor) Facing South-East (800x600).jpg Installing the Shear wall panels at Elev. 7-Stair -4,5 Facing North-East (800x600).jpg Steel angles for the metal deck (3rd Floor) at Elev. 4,5 Facing East (800x600).jpg Backfill and compact inside Stair -2 Facing West(800x600).jpg Bolted column Facing North-West(800x600).jpg Installing steel deck angles at Elev. 1,2,3 (2nd Floor) Facing East (800x600).jpg Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg
Previous pageNext page Steel angles for the metal deck (3rd Floor) at Elev. 4,5 Facing East (800x600)
Steel angles for the metal deck (3rd Floor) at Elev. 4,5 Facing East (800x600)